Site clearance processes demolition waste. We crush concrete and sort scrap steel on-site to reduce hauling costs.
DISCUSS YOUR PROJECT →Suction and cutter dredging systems to clear silt and extract deep-bed alluvial sand deposits safely.
High-capacity wheeled loaders and conveyors for rapid bulk loading into transport dumper fleets.
On-site trommel screening plants to separate clean structural sand from gravel and river silt clay.
Deploying floating turbidity curtains and bank reinforcement structures to protect the local river ecosystem.
Managing environmental impact assessments, lease compliance, and state transit royalty passes (e-ravana).
Fabricating and maintaining heavy-duty temporary access roadways over sandbanks for transport logistics.
Mapping the riverbed depth profile and sand strata thickness before deploying heavy machinery.
Erecting floating turbidity barriers around the extraction coordinates to prevent downstream siltation.
Deploying long-reach crawler excavators and slurry pumps to extract alluvial bed material.
Passing raw sand through trommel screens to separate concrete-grade coarse sand from fine plaster sand.
Weighbridge logging, loading dispatch coordination, and issuing mandatory transit royalty permits.
Yamuna Nagar, Haryana
Faridabad, Haryana
Delhi NCR
Noida, UP
Greater Noida, UP
Ghaziabad, UP
Moti Nagar, New Delhi
Okhla, New Delhi
RPC Infraprojects Pvt. Ltd. provides mechanized riverbed sand excavation, dredging, and bulk logistics services across key coordinates along the Yamuna riverbed including Greater Faridabad, Sonipat, Panipat, Noida, Delhi NCR, Haryana, and Uttar Pradesh. We operate strictly within legal lease permits.
We deploy floating turbidity curtains to capture suspended sediments, monitor river bank stability, and restrict excavation depths to protect local flora and fauna ecosystem standards.
Yes, we manage all regulatory compliance paperwork, including generating e-ravana transit royalty passes, state mining permits, and local environmental NOCs.
Through our on-site screening plants, we sort material into coarse concrete sand (Zone II) and fine plaster sand, ensuring compliance with construction strength requirements.